How do I apply Rugby Original?
- Clean bonding surfaces thoroughly. Remove any trace of water, oil, grease, dust and other impurities.
- Apply even coats of Rugby Contact Cement on both surfaces. Application thickness may vary according to the porosity of substrates. Allow surface to dry for 20–30 minutes. Avoid excessive drying.
- Join the materials together, ensuring parts are properly aligned before pressing. Press parts by applying a uniform pressure by hand or mechanical pressure such as rollers or hammer.